A 290 metre long bridge spanning the lake on a new alignment to the east of the existing bridge.
SCOPE: |
|
EQUIPMENT: |
|
CLIENT: | BGC Contracting |
RELATED PROJECTS
View some of our related projects.
A 290 metre long bridge spanning the lake on a new alignment to the east of the existing bridge.
SCOPE: |
|
EQUIPMENT: |
|
CLIENT: | BGC Contracting |
View some of our related projects.