The Pacific Motorway (M1) between Palm Beach and Tugun is the third and final section of the M1 Pacific Motorway Varsity Lakes to Tugun (VL2T) upgrade, which involves the construction of 10 new bridges.
SCOPE: | 44No. 900mm Bored Piles upto 46m 72No. 1200mm Bored Piles upto 43m 24No. 900mm Marine Bored Piles upto 32m 40No. 900mm Driven Steel Tubular Piles upto 38m 43No. 1200mm Driven Steel Tubular Piles upto 41m |
EQUIPMENT: |
Bauer BG28 Drill Rig |
CLIENT: | Seymour Whyte |
RELATED PROJECTS
View some of our related projects.