Palm Beach to Tugan

The Pacific Motorway (M1) between Palm Beach and Tugun is the third and final section of the M1 Pacific Motorway Varsity Lakes to Tugun (VL2T) upgrade, which involves the construction of 10 new bridges.

SCOPE: 44No. 900mm Bored Piles upto 46m
72No. 1200mm Bored Piles upto 43m
24No. 900mm Marine Bored Piles upto 32m
40No. 900mm Driven Steel Tubular Piles upto 38m
43No. 1200mm Driven Steel Tubular Piles upto 41m
EQUIPMENT:

Bauer BG28 Drill Rig
Bauer BFD1500 Fly Drill
Manitowoc M8500 Crawler Crane
Manitowoc M12000 Crawler Crane
Kobelco CKE2500 Crawler Crane
Juntann HHK16S Impact Hammer
ICE 58B Vibratory Hammer

CLIENT: Seymour Whyte

REQUEST A QUOTE

discuss your next project