Installation of 2 circular secant shafts on the 250MW Kidston Pumped Storage Hydro Project. Designed to generate power to the national grid using a pumped hydro storage process.
SCOPE: | Cable Shaft/Access Shaft 32No x 750mm diameter piles x 9.3m to 13.6m depth Ventilation/Exhaust Shaft 34No x 750mm diameter piles x 9.5m to 15.0m depth |
EQUIPMENT: |
|
CLIENT: | McConnell Dowell John Holland Joint Venture |
RELATED PROJECTS
View some of our related projects.